M.P. Power Generating Co. Ltd
True Up Petition For FY 07   Schedule- 3bi  
Details for Variable Cost for Thermal Generating Stations
As Per Tariff Order
S. No. Particulars ATPS STPS SGTPS  
Total Total Total
1 Coal Cost Coal Rate (Rs/MT) 1139.46 1357.70 1189.67  
2 Cost of Coal Fired  (L Rs.) 11595.67 89974.63 47991.58  
3 Cost of Coal in Tr. & Handling Loss  (L Rs.) 34.89 725.60 879.68  
4 Total Cosl Cost (L Rs.) 11630.57 90700.23 48871.26  
5 Oil
Cost
Rate of Furnace Oil  (Rs./kL)        
6 Cost of Furnace Oil (L Rs)        
7 Rate of HSD / LDO  (Rs./kL)        
8 Cost of HSD / LDO (L Rs.)        
9 Rate of Secondary Oil  (Rs /kL) 18592 20691 22870  
10 Cost of Secondary Oil (L Rs.) 1722.31 4272.29 2541.13  
11 Other Fuel Related Costs (L Rs.)        
12 Fuel Related Variable Cost Coal Rate (4+10+11) (L Rs.)        
13 Rate p/u        
14   Rent ,Rates & Taxes        
15 Water Charges        
16 MPERC FEES(Rs 5000 per MW)        
17 Total Other Cost 97.00 759.00 409.00  
18 Variable Cost Total Variable Cost (L Rs.) 13450 95732 51821  
19 Rate p/u 117 135 103