M.P. Power Generating Co. Ltd
True Up Petition For FY 07     Schedule 4
Repair and Maintenance Expenditure
S.No Particulars Account Code Allowed in Tariff Order  
  Total
1 2 3 4 5
1 Plant and Machinery 74.1xx   12649.19
1 Switchgears Including Cable Connection 101   352.32
2 Boiler & Auxiliaries 102   5809.87
3 TG  & Auxiliaries 103   2472.27
4 Misc. Plants & Equipments 104   451.93
5 Cooling System / Towers 105   9.90
6 Coal Handling Plant & Equipments 106   1377.46
7 Ash Handling Plant 107   441.02
8 Instrumentation and Controls 108   792.22
9 Electrical Equipments / Lamps & Fittings 110-180   184.45
10 Communication Equipments 181   17.62
11 Testing Equipments 182   94.43
12 Others 190-199   645.68
2 Building 74.2xx   306.53
1 Building Containing Generating Equipments 201   95.00
2 Sub Station Building 210-260   2.18
3 Other Buildings 270   209.35
3 Civil Works 74.3xx   392.47
4 Hydraulic Works 74.4xx   624.37
5 Lines, Cables Net Works etc. 74.5xx   0.59
6 Vehicles 74.6xx   78.59
7 Furniture and Fixtures 74.7xx   0.86
8 Office Equipments 74.8xx   3.53
9 Station Supplies 74.9xx   0.00
10 Other Credits to R&M Charges 74.998   -16.00
11 Prior Period Charges 28.300   0.00
12 R&M Expenditure Before Capitalization         0.00 14040.13
13 Any other items (Capitalization) 74.999 0.00 -1.88
14 HO Allocation on 100% basis     160.03
15 Total    0.00 14198.28
Capitalisation Station Supplies 0.00
Capitalisation -1.88
Total -1.88
As shown in B/S 3.36
Difference -5.24