| ANALYSIS OF FORCED OUTAGES - STPS SARNI 2009-10 | |||||||
| APRIL | |||||||
| S.N. | DETAILS | DATE OF SHUTDOWN | DATE OF SYNCHRONISATION | PERIOD IN HOURS | MU LOST | REASON | CORRECTIVE ACTION TAKEN |
| PLANNED | |||||||
| 1 | UNIT-1 | 0.00 | 0.00 | ||||
| 2 | UNIT-2 | 0.00 | 0.00 | ||||
| 3 | UNIT-3 | 0.00 | 0.00 | ||||
| 4 | UNIT-4 | 0.00 | 0.00 | ||||
| 5 | UNIT-5 | 0.00 | 0.00 | ||||
| 6 | UNIT-6 | 0.00 | 0.00 | ||||
| 7 | UNIT-7 | 0.00 | 0.00 | ||||
| 8 | UNIT-8 | 0.00 | 0.00 | ||||
| 9 | UNIT-9 | 0.00 | 0.00 | ||||
| FORCED | |||||||
| 1 | UNIT-1 | 07.04.2009 | 08.04.2009 | 26.17 | 1.64 | Fire in Wind Box | Getting normal parameters, Unit synchronised. |
| 13.04.2009 | 15.04.2009 | 40.23 | 2.52 | Fire in Wind Box | Getting normal parameters, Unit synchronised. | ||
| UNIT-2 | 23.04.2009 | 25.04.2009 | 47.13 | 2.95 | Fire in Wind Box | Getting normal parameters, Unit synchronised. | |
| 28.04.2009 | 28.04.2009 | 2 | 0.13 | TST, Loss of Excitation. | Getting normal parameters, Unit synchronised. | ||
| 2 | 29.04.2009 | 29.04.2009 | 1.23 | 0.086 | TST | Getting normal parameters, Unit synchronised. | |
| 3 | UNIT-3 | 13.04.2009 | 13.04.2009 | 5.44 | 0.36 | TST Low Vaccum | Getting normal parameters, Unit synchronised. |
| 20.04.2009 | 21.04.2009 | 44.52 | 2.80 | Sec S/H Tube Leakage | Tube Cuts & replaced. | ||
| 25.04.2009 | 26.04.2009 | 2.48 | 0.18 | TST BFP Tripped. | Getting normal parameters, Unit synchronised. | ||
| 4 | UNIT-4 | 08.04.2009 | 08.04.2009 | 1.38 | 0.10 | TST Parameter Hunting. | Getting normal parameters, Unit synchronised. |
| UNIT-5 | 05.04.2009 | 05.04.2009 | 0.27 | 0.03 | TST Low Vaccum | Getting normal parameters, Unit synchronised. | |
| 27.04.2009 | 27.04.2009 | 14.35 | 0.91 | Condenser Hardness | Tube Cuts & replaced. | ||
| 29.04.2009 | 01.05.2009 | 35.10 | 2.20 | Sec S/H Tube Leakage | Tube Cuts & replaced. | ||
| UNIT-6 | 10.04.2009 | 10.04.2009 | 0.30 | 0.10 | Flame Failure | Getting normal parameters, Unit synchronised. | |
| 30.04.2009 | 01.05.2009 | 3.30 | 0.70 | Fire occur in 250 MVA GT | Getting normal parameters, Unit synchronised. | ||
| UNIT-7 | 21.04.2009 | 21.04.2009 | 0.20 | 0.07 | Flame Failure | Tube Cuts & replaced. | |
| 30.04.2009 | 01.05.2009 | 11.35 | 2.43 | Water Wall Tube Leakage | Tube Cuts & replaced. | ||
| UNIT-8 | 21.04.2009 | 22.04.2009 | 26.40 | 5.60 | Economiser Tube Leakage | Tube Cuts & replaced. | |
| 25.04.2009 | 27.04.2009 | 35.45 | 7.51 | LTSH Tube Leakage | Tube Cuts & replaced. | ||
| 27.04.2009 | 27.04.2009 | 0.51 | 0.18 | Drum Level Low | Getting normal parameters, Unit synchronised. | ||
| UNIT-9 | 05.04.2009 | 08.04.2009 | 55.52 | 11.73 | Economiser Tube Leakage | Tube Cuts & replaced. | |
| 19.04.2009 | 20.04.2009 | 33.40 | 7.07 | LTSH Tube Leakage | Tube Cuts & replaced. | ||
| 21.04.2009 | 21.04.2009 | 2.35 | 0.54 | Air Heater 9A Tripped | Getting normal parameters, Unit synchronised. | ||
| 22.04.2009 | 22.04.2009 | 0.45 | 0.16 | Low Vaccum | Getting normal parameters, Unit synchronised. | ||
| TOTAL | 389.53 | 49.99 | |||||
| MAY | |||||||
| S.N. | DETAILS | DATE OF SHUTDOWN | DATE OF SYNCHRONISATION | PERIOD IN HOURS | MU LOST | REASON | CORRECTIVE ACTION TAKEN |
| PLANNED | |||||||
| 1 | UNIT-1 | 0.00 | 0.00 | ||||
| 2 | UNIT-2 | 0.00 | 0.00 | ||||
| 3 | UNIT-3 | 0.00 | 0.00 | ||||
| 4 | UNIT-4 | 0.00 | 0.00 | ||||
| 5 | UNIT-5 | 0.00 | 0.00 | ||||
| 6 | UNIT-6 | 0.00 | 0.00 | ||||
| 7 | UNIT-7 | 0.00 | 0.00 | ||||
| 8 | UNIT-8 | 0.00 | 0.00 | ||||
| 9 | UNIT-9 | 0.00 | 0.00 | ||||
| FORCED | |||||||
| 1 | UNIT-1 | 23.05.2009 | 23.05.2009 | 4.00 | 0.25 | TST Fuel Oil Pump | Getting normal parameters, Unit synchronised. |
| 28.05.2009 | 28.05.2009 | 12.21 | 0.77 | Fire in Wind Box | Getting normal parameters, Unit synchronised. | ||
| 29.05.2009 | 29.05.2009 | 14.35 | 0.91 | Fire in Wind Box | Getting normal parameters, Unit synchronised. | ||
| 2 | UNIT-2 | 21.05.2009 | 23.05.2009 | 46.44 | 2.92 | Boiler Tube Leakage | Tube Cuts & replaced. |
| 3 | UNIT-3 | 20.05.2009 | 22.05.2009 | 26.37 | 1.66 | PSH Tube Leakage | Tube Cuts & replaced. |
| 25.05.2009 | 26.05.2009 | 19.49 | 1.24 | Economiser Tube Leakage | Tube Cuts & replaced. | ||
| 4 | UNIT-4 | 05.05.2009 | 07.05.2009 | 59.27 | 3.72 | Exciter Problem | Getting normal parameters, Unit synchronised. |
| 27.05.2009 | 27.05.2009 | 1.44 | 0.11 | Exciter Problem | Getting normal parameters, Unit synchronised. | ||
| UNIT-5 | 05.05.2009 | 06.05.2009 | 20.54 | 1.31 | Water Wall Tube Leakage | Tube Cuts & replaced. | |
| 21.05.2009 | 21.05.2009 | 2.24 | 0.15 | TST Trust Bearing Failure | Getting normal parameters, Unit synchronised. | ||
| 24.05.2009 | 24.05.2009 | 0.31 | 0.03 | TST Without Indicator | Getting normal parameters, Unit synchronised. | ||
| 24.05.2009 | 24.05.2009 | 0.24 | 0.03 | TST Trust Bearing Failure | Getting normal parameters, Unit synchronised. | ||
| 31.05.2009 | 02.06.2009 | 38.57 | 2.43 | TST Trust Bearing Failure | Getting normal parameters, Unit synchronised. | ||
| UNIT-6 | 01.05.2009 | 31.05.2009 | 744.00 | 148.80 | C.O.H. | ||
| UNIT-7 | 01.05.2009 | 02.05.2009 | 24.35 | 5.16 | Water Wall Tube Leakage | Tube Cuts & replaced. | |
| UNIT-8 | No Tripping | ||||||
| UNIT-9 | 18.05.2009 | 18.05.2009 | 1.25 | 0.30 | Turbine Parameter Out | Getting normal parameters, Unit synchronised. | |
| TOTAL | 1015.07 | 169.79 | |||||
| JUNE | |||||||
| S.N. | DETAILS | DATE OF SHUTDOWN | DATE OF SYNCHRONISATION | PERIOD IN HOURS | MU LOST | REASON | CORRECTIVE ACTION TAKEN |
| PLANNED | |||||||
| 1 | UNIT-1 | 0.00 | 0.00 | ||||
| 2 | UNIT-2 | 0.00 | 0.00 | ||||
| 3 | UNIT-3 | 0.00 | 0.00 | ||||
| 4 | UNIT-4 | 0.00 | 0.00 | ||||
| 5 | UNIT-5 | 0.00 | 0.00 | ||||
| 6 | UNIT-6 | 0.00 | 0.00 | ||||
| 7 | UNIT-7 | 0.00 | 0.00 | ||||
| 8 | UNIT-8 | 0.00 | 0.00 | ||||
| 9 | UNIT-9 | 0.00 | 0.00 | ||||
| FORCED | |||||||
| 1 | UNIT-1 | 03.06.2009 | 05.07.2009 | 777:15 | 48.58 | A.O.H. | |
| 2 | UNIT-2 | 07.06.2009 | 08.06.2009 | 33:29 | 2.09 | Economiser Tube Leakage | Tube Leakage Attended |
| 09.06.2009 | 10.06.2009 | 31:17 | 1.96 | Water Wall Tube Leakage | Tube Leakage Attended | ||
| 17.06.2009 | 17.06.2009 | 1:13 | 0.08 | TST MS Temp. drop | Getting normal parameters, Unit synchronised. | ||
| 3 | UNIT-3 | 19.06.2009 | 21.06.2009 | 44:35 | 2.79 | Water Wall Tube Leakage | Tube Leakage Attended |
| 4 | UNIT-4 | 15.06.2009 | 17.06.2009 | 30:20 | 1.90 | Economiser Tube Leakage | Tube Leakage Attended |
| 25.06.2009 | 25.06.2009 | 1:48 | 0.11 | Low Vaccum | Getting normal parameters, Unit synchronised. | ||
| 25.06.2009 | 25.06.2009 | 00:40 | 0.04 | Low Vaccum | Getting normal parameters, Unit synchronised. | ||
| 27.06.2009 | 29.06.2009 | 52:10 | 3.26 | Low Vaccum | Getting normal parameters, Unit synchronised. | ||
| 5 | UNIT-5 | 01.06.2009 | 02.06.2009 | 30:11 | 1.89 | Water Wall Tube Leakage | Tube Leakage Attended |
| 02.06.2009 | 02.06.2009 | 00:21 | 0.02 | Low Vaccum | Getting normal parameters, Unit synchronised. | ||
| 09.06.2009 | 09.06.2009 | 00:24 | 0.03 | Low Vaccum | Getting normal parameters, Unit synchronised. | ||
| 14.06.2009 | 16.06.2009 | 61:34 | 3.85 | Water Wall Tube Leakage | Tube Leakage Attended | ||
| 18.06.2009 | 19.06.2009 | 21:48 | 1.36 | Low Vaccum | Getting normal parameters, Unit synchronised. | ||
| 22.06.2009 | 01.07.2009 | 199:40 | 12.48 | Low Vaccum | Getting normal parameters, Unit synchronised. | ||
| 6 | UNIT-6 | 01.06.2009 | 11.06.2009 | 249:45 | 49.95 | C.O.H. | After carrying out COH, Unit Syn. |
| 12.06.2009 | 15.06.2009 | 71.10 | 14.23 | P.S.H. Tube Leakage. | Tube Leakage Attended | ||
| 18.06.2009 | 18.06.2009 | 00:15 | 0.05 | Flame Failure | Getting normal parameters, Unit synchronised. | ||
| 23.06.2009 | 24.06.2009 | 33:00 | 6.60 | Low Vaccum | Getting normal parameters, Unit synchronised. | ||
| 28.06.2009 | 28.06.2009 | 00:30 | 0.10 | Low Vaccum | Getting normal parameters, Unit synchronised. | ||
| 28.06.2009 | 29.06.2009 | 23:15 | 4.65 | Low Vaccum | Getting normal parameters, Unit synchronised. | ||
| 30.06.2009 | 30.06.2009 | 01:35 | 0.32 | Low Vaccum | Getting normal parameters, Unit synchronised. | ||
| 30.06.2009 | 01.07.09 | 08:45 | 1.75 | Low Vaccum | Getting normal parameters, Unit synchronised. | ||
| 7 | UNIT-7 | 11.06.2009 | 11.06.2009 | 00:25 | 0.09 | Turbine Class A Protection | Getting normal parameters, Unit synchronised. |
| 12.06.2009 | 15.06.2009 | 49:10 | 10.33 | Low Vaccum | Getting normal parameters, Unit synchronised. | ||
| 16.06.2009 | 16.06.2009 | 00:30 | 0.11 | Furnace Draught High | Getting normal parameters, Unit synchronised. | ||
| 17.06.2009 | 17.06.2009 | 01:05 | 0.23 | Flame Failure | Getting normal parameters, Unit synchronised. | ||
| 19.06.2009 | 19.06.2009 | 00:50 | 0.18 | Furnace Pressure High | Getting normal parameters, Unit synchronised. | ||
| 20.06.2009 | 22.06.2009 | 44:10 | 9.28 | Economiser Tube Leakage | Tube Leakage Attended | ||
| 23.06.2009 | 23.06.2009 | 00:10 | 0.04 | Flame Failure | Getting normal parameters, Unit synchronised. | ||
| 26.06.2009 | 26.06.2009 | 00:30 | 0.11 | Flame Failure | Getting normal parameters, Unit synchronised. | ||
| 28.06.2009 | 29.06.2009 | 01:10 | 0.25 | Low Vaccum | Getting normal parameters, Unit synchronised. | ||
| 29.06.2009 | 29.06.2009 | 01:50 | 0.39 | Low Vaccum | Getting normal parameters, Unit synchronised. | ||
| 29.06.2009 | 30.06.2009 | 22:35 | 4.74 | Low Vaccum | Getting normal parameters, Unit synchronised. | ||
| 30.06.2009 | 30.06.2009 | 00:15 | 0.05 | Low Vaccum | Getting normal parameters, Unit synchronised. | ||
| 8 | UNIT-8 | 07.06.2009 | 07.06.2009 | 02:50 | 0.60 | Boiler Protection Trip. | Getting normal parameters, Unit synchronised. |
| 15.06.2009 | 01.07.09 | 368:40 | 77.42 | A.O.H. | |||
| 9 | UNIT-9 | 01.06.2009 | 01.06.2009 | 04:20 | 0.91 | Air Heater 9A Tripped | Getting normal parameters, Unit synchronised. |
| 11.06.2009 | 12.06.2009 | 43:43 | 9.18 | Water Wall Tube Leakage | Tube Leakage Attended | ||
| TOTAL | 0.00 | 271.94 | |||||