ANALYSIS OF FORCED OUTAGES -  STPS SARNI   2009-10
 
APRIL
S.N. DETAILS DATE OF SHUTDOWN DATE OF SYNCHRONISATION PERIOD IN HOURS MU  LOST REASON CORRECTIVE ACTION TAKEN
  PLANNED
1 UNIT-1     0.00 0.00    
2 UNIT-2     0.00 0.00    
3 UNIT-3     0.00 0.00    
4 UNIT-4     0.00 0.00    
5 UNIT-5     0.00 0.00    
6 UNIT-6     0.00 0.00    
7 UNIT-7     0.00 0.00    
8 UNIT-8     0.00 0.00    
9 UNIT-9     0.00 0.00    
  FORCED
1 UNIT-1 07.04.2009 08.04.2009 26.17 1.64 Fire in Wind Box Getting normal parameters, Unit synchronised.
13.04.2009 15.04.2009 40.23 2.52 Fire in Wind Box Getting normal parameters, Unit synchronised.
  UNIT-2 23.04.2009 25.04.2009 47.13 2.95 Fire in Wind Box Getting normal parameters, Unit synchronised.
  28.04.2009 28.04.2009 2 0.13 TST, Loss of Excitation. Getting normal parameters, Unit synchronised.
2 29.04.2009 29.04.2009 1.23 0.086 TST Getting normal parameters, Unit synchronised.
3 UNIT-3 13.04.2009 13.04.2009 5.44 0.36 TST Low Vaccum Getting normal parameters, Unit synchronised.
20.04.2009 21.04.2009 44.52 2.80 Sec S/H Tube Leakage Tube Cuts & replaced.
25.04.2009 26.04.2009 2.48 0.18 TST BFP Tripped. Getting normal parameters, Unit synchronised.
4 UNIT-4 08.04.2009 08.04.2009 1.38 0.10 TST Parameter Hunting. Getting normal parameters, Unit synchronised.
  UNIT-5 05.04.2009 05.04.2009 0.27 0.03 TST Low Vaccum Getting normal parameters, Unit synchronised.
  27.04.2009 27.04.2009 14.35 0.91 Condenser Hardness Tube Cuts & replaced.
  29.04.2009 01.05.2009 35.10 2.20 Sec S/H Tube Leakage Tube Cuts & replaced.
  UNIT-6 10.04.2009 10.04.2009 0.30 0.10 Flame Failure Getting normal parameters, Unit synchronised.
  30.04.2009 01.05.2009 3.30 0.70 Fire occur in 250 MVA GT Getting normal parameters, Unit synchronised.
  UNIT-7 21.04.2009 21.04.2009 0.20 0.07 Flame Failure Tube Cuts & replaced.
  30.04.2009 01.05.2009 11.35 2.43 Water Wall Tube Leakage Tube Cuts & replaced.
  UNIT-8 21.04.2009 22.04.2009 26.40 5.60 Economiser Tube Leakage Tube Cuts & replaced.
  25.04.2009 27.04.2009 35.45 7.51 LTSH Tube Leakage Tube Cuts & replaced.
  27.04.2009 27.04.2009 0.51 0.18 Drum Level Low Getting normal parameters, Unit synchronised.
  UNIT-9 05.04.2009 08.04.2009 55.52 11.73 Economiser Tube Leakage Tube Cuts & replaced.
  19.04.2009 20.04.2009 33.40 7.07 LTSH Tube Leakage Tube Cuts & replaced.
  21.04.2009 21.04.2009 2.35 0.54 Air Heater 9A Tripped Getting normal parameters, Unit synchronised.
  22.04.2009 22.04.2009 0.45 0.16 Low Vaccum Getting normal parameters, Unit synchronised.
  TOTAL     389.53 49.99    
   
MAY
S.N. DETAILS DATE OF SHUTDOWN DATE OF SYNCHRONISATION PERIOD IN HOURS MU  LOST REASON CORRECTIVE ACTION TAKEN
  PLANNED
1 UNIT-1     0.00 0.00    
2 UNIT-2     0.00 0.00    
3 UNIT-3     0.00 0.00    
4 UNIT-4     0.00 0.00    
5 UNIT-5     0.00 0.00    
6 UNIT-6     0.00 0.00    
7 UNIT-7     0.00 0.00    
8 UNIT-8     0.00 0.00    
9 UNIT-9     0.00 0.00    
  FORCED
1 UNIT-1 23.05.2009 23.05.2009 4.00 0.25 TST Fuel Oil Pump Getting normal parameters, Unit synchronised.
28.05.2009 28.05.2009 12.21 0.77 Fire in Wind Box Getting normal parameters, Unit synchronised.
29.05.2009 29.05.2009 14.35 0.91 Fire in Wind Box Getting normal parameters, Unit synchronised.
2 UNIT-2 21.05.2009 23.05.2009 46.44 2.92 Boiler Tube Leakage Tube Cuts & replaced.
3 UNIT-3 20.05.2009 22.05.2009 26.37 1.66 PSH Tube Leakage Tube Cuts & replaced.
25.05.2009 26.05.2009 19.49 1.24 Economiser Tube Leakage Tube Cuts & replaced.
4 UNIT-4 05.05.2009 07.05.2009 59.27 3.72 Exciter Problem Getting normal parameters, Unit synchronised.
  27.05.2009 27.05.2009 1.44 0.11 Exciter Problem Getting normal parameters, Unit synchronised.
  UNIT-5 05.05.2009 06.05.2009 20.54 1.31 Water Wall Tube Leakage Tube Cuts & replaced.
  21.05.2009 21.05.2009 2.24 0.15 TST Trust Bearing Failure Getting normal parameters, Unit synchronised.
  24.05.2009 24.05.2009 0.31 0.03 TST Without Indicator Getting normal parameters, Unit synchronised.
  24.05.2009 24.05.2009 0.24 0.03 TST Trust Bearing Failure Getting normal parameters, Unit synchronised.
  31.05.2009 02.06.2009 38.57 2.43 TST Trust Bearing Failure Getting normal parameters, Unit synchronised.
  UNIT-6 01.05.2009 31.05.2009 744.00 148.80 C.O.H.  
  UNIT-7 01.05.2009 02.05.2009 24.35 5.16 Water Wall Tube Leakage Tube Cuts & replaced.
  UNIT-8           No Tripping
  UNIT-9 18.05.2009 18.05.2009 1.25 0.30 Turbine Parameter Out Getting normal parameters, Unit synchronised.
  TOTAL     1015.07 169.79    
JUNE
S.N. DETAILS DATE OF SHUTDOWN DATE OF SYNCHRONISATION PERIOD IN HOURS MU  LOST REASON CORRECTIVE ACTION TAKEN
  PLANNED
1 UNIT-1     0.00 0.00    
2 UNIT-2     0.00 0.00    
3 UNIT-3     0.00 0.00    
4 UNIT-4     0.00 0.00    
5 UNIT-5     0.00 0.00    
6 UNIT-6     0.00 0.00    
7 UNIT-7     0.00 0.00    
8 UNIT-8     0.00 0.00    
9 UNIT-9     0.00 0.00    
  FORCED
1 UNIT-1 03.06.2009 05.07.2009 777:15 48.58 A.O.H.  
2 UNIT-2 07.06.2009 08.06.2009 33:29 2.09 Economiser Tube Leakage Tube Leakage Attended
09.06.2009 10.06.2009 31:17 1.96 Water Wall Tube Leakage Tube Leakage Attended
17.06.2009 17.06.2009 1:13 0.08 TST MS Temp. drop Getting normal parameters, Unit synchronised.
3 UNIT-3 19.06.2009 21.06.2009 44:35 2.79 Water Wall Tube Leakage Tube Leakage Attended
4 UNIT-4 15.06.2009 17.06.2009 30:20 1.90 Economiser Tube Leakage Tube Leakage Attended
25.06.2009 25.06.2009 1:48 0.11 Low Vaccum Getting normal parameters, Unit synchronised.
25.06.2009 25.06.2009 00:40 0.04 Low Vaccum Getting normal parameters, Unit synchronised.
27.06.2009 29.06.2009 52:10 3.26 Low Vaccum Getting normal parameters, Unit synchronised.
5 UNIT-5 01.06.2009 02.06.2009 30:11 1.89 Water Wall Tube Leakage Tube Leakage Attended
02.06.2009 02.06.2009 00:21 0.02 Low Vaccum Getting normal parameters, Unit synchronised.
09.06.2009 09.06.2009 00:24 0.03 Low Vaccum Getting normal parameters, Unit synchronised.
14.06.2009 16.06.2009 61:34 3.85 Water Wall Tube Leakage Tube Leakage Attended
18.06.2009 19.06.2009 21:48 1.36 Low Vaccum Getting normal parameters, Unit synchronised.
22.06.2009 01.07.2009 199:40 12.48 Low Vaccum Getting normal parameters, Unit synchronised.
6 UNIT-6 01.06.2009 11.06.2009 249:45 49.95 C.O.H. After carrying out COH, Unit Syn.
12.06.2009 15.06.2009 71.10 14.23 P.S.H. Tube Leakage. Tube Leakage Attended
18.06.2009 18.06.2009 00:15 0.05 Flame Failure Getting normal parameters, Unit synchronised.
23.06.2009 24.06.2009 33:00 6.60 Low Vaccum Getting normal parameters, Unit synchronised.
28.06.2009 28.06.2009 00:30 0.10 Low Vaccum Getting normal parameters, Unit synchronised.
28.06.2009 29.06.2009 23:15 4.65 Low Vaccum Getting normal parameters, Unit synchronised.
30.06.2009 30.06.2009 01:35 0.32 Low Vaccum Getting normal parameters, Unit synchronised.
30.06.2009 01.07.09 08:45 1.75 Low Vaccum Getting normal parameters, Unit synchronised.
7 UNIT-7 11.06.2009 11.06.2009 00:25 0.09 Turbine Class A Protection Getting normal parameters, Unit synchronised.
12.06.2009 15.06.2009 49:10 10.33 Low Vaccum Getting normal parameters, Unit synchronised.
16.06.2009 16.06.2009 00:30 0.11 Furnace Draught High Getting normal parameters, Unit synchronised.
17.06.2009 17.06.2009 01:05 0.23 Flame Failure Getting normal parameters, Unit synchronised.
19.06.2009 19.06.2009 00:50 0.18 Furnace Pressure High Getting normal parameters, Unit synchronised.
20.06.2009 22.06.2009 44:10 9.28 Economiser Tube Leakage Tube Leakage Attended
23.06.2009 23.06.2009 00:10 0.04 Flame Failure Getting normal parameters, Unit synchronised.
26.06.2009 26.06.2009 00:30 0.11 Flame Failure Getting normal parameters, Unit synchronised.
28.06.2009 29.06.2009 01:10 0.25 Low Vaccum Getting normal parameters, Unit synchronised.
29.06.2009 29.06.2009 01:50 0.39 Low Vaccum Getting normal parameters, Unit synchronised.
29.06.2009 30.06.2009 22:35 4.74 Low Vaccum Getting normal parameters, Unit synchronised.
30.06.2009 30.06.2009 00:15 0.05 Low Vaccum Getting normal parameters, Unit synchronised.
8 UNIT-8 07.06.2009 07.06.2009 02:50 0.60 Boiler Protection Trip. Getting normal parameters, Unit synchronised.
15.06.2009 01.07.09 368:40 77.42 A.O.H.  
9 UNIT-9 01.06.2009 01.06.2009 04:20 0.91 Air Heater 9A Tripped Getting normal parameters, Unit synchronised.
11.06.2009 12.06.2009 43:43 9.18 Water Wall Tube Leakage Tube Leakage Attended
  TOTAL     0.00 271.94