ANALYSIS OF FORCED OUTAGES -  STPS SARNI   2009-10
 
JULY
S.N. DETAILS DATE OF SHUTDOWN DATE OF SYNCHRONISATION PERIOD IN HR:MIN MU  LOST REASON CORRECTIVE ACTION TAKEN
  PLANNED
1 UNIT-1 01.07.2009 05.07.2009 115:55 7.25 A.O.H.  
  UNIT-3 15.07.2009 10.08.2009 631:55 39.49 A.O.H.  
  FORCED
  UNIT-1 19.07.2009 22.07.2009 82:14 5.14 Boiler Tube Leakage Getting normal parameters, Unit synchronised.
2 UNIT-2 01.07.2009 03.07.2009 36:19 2.27 Turbine Oil Leakage After attending leakage, Unit synchronised.
30.07.2009 31.07.2009 27:31 1.72 Condenser Hardness Getting normal parameters, Unit synchronised.
3 UNIT-4 02.07.2009 02.07.2009 0:25 0.03 Main Steam Temp.Low Getting normal parameters, Unit synchronised.
07.07.2009 09.07.2009 44:58 2.81 Water Wall Tube Leakage Tube Leakage attended & Unit synch.
14.07.2009 15.07.2009 20:06 1.26 Economiser Tube Leakage Tube Leakage attended & Unit synch.
4 UNIT-5 01.07.2009 02.07.2009 28:00 1.75 Low Vaccum Getting normal parameters, Unit synchronised.
12.07.2009 13.07.2009 42:44 2.67 Water Wall Tube Leakage Tube Leakage attended & Unit synch.
14.07.2009 14.07.2009 1:13 0.08 Low Vaccum Getting normal parameters, Unit synchronised.
5 UNIT-6 01.07.2009 02.07.2009 40:15 8.05 Low Vaccum Getting normal parameters, Unit synchronised.
02.07.2009 02.07.2009 00:40 0.13 Low Vaccum Getting normal parameters, Unit synchronised.
02.07.2009 06.07.2009 90:35 18.12 Low Vaccum Getting normal parameters, Unit synchronised.
12.07.2009 12.07.2009 04:10 0.83 Low Vaccum Getting normal parameters, Unit synchronised.
13.07.2009 13.07.2009 03:15 0.65 Excitation Failure Getting normal parameters, Unit synchronised.
28.07.2009 29.07.2009 32:40 6.53 Replacement of Thyrestor No. 1 After attending fault, Unit synchronised.
6 UNIT-7 01.07.2009 01.07.2009 0:20 0.07 Flame Failure Getting normal parameters, Unit synchronised.
01.07.2009 04.07.2009 74:10 15.58 Low Vaccum Getting normal parameters, Unit synchronised.
15.07.2009 15.07.2009 1:00 0.21 Furnace Pressure High Getting normal parameters, Unit synchronised.
15.07.2009 15.07.2009 0:15 0.05 Furnace Pressure High Getting normal parameters, Unit synchronised.
15.07.2009 15.07.2009 0:35 0.12 Low Vaccum Getting normal parameters, Unit synchronised.
17.07.2009 17.07.2009 01:10 0.25 Furnace Pressure High Getting normal parameters, Unit synchronised.
30.07.2009 31.07.2009 01:50 0.39 UAT 7B Winding Temp High Getting normal parameters, Unit synchronised.
7 UNIT-8 13.07.2009 13.07.2009 01:12 0.25 Low Vaccum Getting normal parameters, Unit synchronised.
14.07.2009 14.07.2009 06:48 1.43 Steam Temp low Getting normal parameters, Unit synchronised.
15.07.2009 15.07.2009 02:37 0.55 Boiler MCC Earth Fault Getting normal parameters, Unit synchronised.
17.07.2009 19.07.2009 48:12 10.12 Reheater Tube Leakage Tube Leakage attended & Unit synch.
22.07.2009 22.07.2009 02:28 0.52 Excitation Transformer Over Current Getting normal parameters, Unit synchronised.
8 UNIT-9 01.07.2009 27.07.2009 639:15 134.24 C.O.H.  
29.07.2009 29.07.2009 02:25 0.51 Excitation Transformer Over Current Getting normal parameters, Unit synchronised.
  TOTAL       216.33    
   
   
AUGUST
S.N. DETAILS DATE OF SHUTDOWN DATE OF SYNCHRONISATION PERIOD IN HR:MIN MU  LOST REASON CORRECTIVE ACTION TAKEN
  PLANNED
3 UNIT-3 01.08.2009 10.08.2009 233:20 14.58 A.O.H.  
  FORCED
1 UNIT-1 19.08.2009 19.08.2009 00:26 0.03 TST Low Vaccum Getting normal parameters, Unit synchronised.
20.08.2009 20.08.2009 00:23 0.02 TST Low Vaccum Getting normal parameters, Unit synchronised.
2 UNIT-2 01.08.2009 02.08.2009 26:49 1.68 ID Fan 2A high vibration Getting normal parameters, Unit synchronised.
05.08.2009 05.08.2009 02:08 0.13 TST Furnace Oil Pr. Low Getting normal parameters, Unit synchronised.
22.08.2009 24.08.2009 35:50 2.24 3.3 KV dead at time of IDF 2B Getting normal parameters, Unit synchronised.
3 UNIT-3 26.08.2009 28.08.2009 45:28 2.84 Sec. S/H Tube Leakage Tube Cuts & replaced.
4 UNIT-4 23.08.2009 26.08.2009 60:20 3.77 Economiser Tube Lealage Tube Cuts & replaced.
5 UNIT-5 14.08.2009 14.08.2009 02:35 0.16 TST main feed pipe line valve pressure low Getting normal parameters, Unit synchronised.
28.08.2009 31.08.2009 53:55 3.37 Condenser Tube Leakage Tube Cuts & replaced.
6 UNIT-6 29.08.2009 29.08.2009 01:05 0.22 Furnace Pressure High Getting normal parameters, Unit synchronised.
7 UNIT-7 02.08.2009 02.08.2009 00:25 0.09 Furnace Draught High Getting normal parameters, Unit synchronised.
02.08.2009 02.08.2009 00:15 0.05 Flame Failure Getting normal parameters, Unit synchronised.
04.08.2009 04.08.2009 04:00 0.84 Air Heater 7B Tripped Getting normal parameters, Unit synchronised.
05.08.2009 05.08.2009 00:15 0.05 Flame Failure Getting normal parameters, Unit synchronised.
16.08.2009 16.08.2009 00:20 0.07 Flame Failure Getting normal parameters, Unit synchronised.
19.08.2009 21.08.2009 48:15 10.13 Water Wall Tube Leakage Tube Cuts & replaced.
27.08.2009 27.08.2009 01:10 0.25 Generator Earth Fault Fault attended.
8 UNIT-8 25.08.2009 27.08.2009 31:00 6.51 Economiser Tube Lealage Tube Cuts & replaced.
27.08.2009 27.08.2009 02:45 0.58 PA Fan 8A foundation bolt rep. Problem attended
9 UNIT-9 27.08.2009 27.08.2009 01:10 0.25 Generator Earth Fault Fault attended.
  TOTAL       33.27    
SEPTEMBER
S.N. DETAILS DATE OF SHUTDOWN DATE OF SYNCHRONISATION PERIOD IN HR:MIN MU  LOST REASON CORRECTIVE ACTION TAKEN
  PLANNED
1 UNIT-2 11.09.09       A.O.H.  
2 UNIT-7 07.09.09 29.09.09     A.O.H.  
  FORCED
1 UNIT-1 04.09.2009 06.09.2009 53:12 3.33 Boiler & Air Heater maint. Work After maint. Work, unit synchronised.
2 UNIT-3 09.09.2009 11.09.2009 39:51 2.49 TST operated due to arrestor blast Problem Attended, Unit synchronised.
14.09.2009 16.09.2009 33:41 2.11 Boiler Tube Leakage Tube Cuts & replaced.
3 UNIT-4 09.09.2009 11.09.2009 47:02 2.94 Water Wall Tube Leakage Tube Cuts & replaced.
4 UNIT-5 05.09.2009 05.09.2009 00:25 0.03 Low Vaccum Problem Attended
19.09.2009 20.092009 21:35 1.35 Boiler Tube Leakage Tube Cuts & replaced.
5 UNIT-6 05.09.2009 07.09.2009 40:00 8.00 Water Wall Tube Leakage Tube Cuts & replaced.
6 UNIT-8 09.09.2009 09.09.2009 04:35 0.96 Air Heater 8A Motor tripped Problem attended
30.09.2009 30.09.2009 09:35 2.01 Air Heater 8A Motor tripped Problem attended
7 UNIT-9 05.09.2009 07.09.2009 57:55 12.16 Economiser Tube Lealage Tube Cuts & replaced.
  TOTAL       35.38