| ANALYSIS OF FORCED OUTAGES - STPS SARNI 2009-10 | |||||||
| OCTOBER | |||||||
| S.N. | DETAILS | DATE OF SHUTDOWN | DATE OF SYNCHRONISATION | PERIOD IN HR:MIN | MU LOST | REASON | CORRECTIVE ACTION TAKEN |
| PLANNED | |||||||
| 1 | UNIT-2 | 11.09.2009 | 04.10.2009 | 557.58 | 34.87 | A.O.H. | |
| FORCED | |||||||
| 1 | UNIT-1 | 04.10.2009 | 04.10.2009 | 0.37 | 0.04 | TST | Getting normal parameters, Unit synchronised. |
| 07.10.2009 | 08.10.2009 | 4.27 | 0.28 | TST MS TEMP LOW | Getting normal parameters, Unit synchronised. | ||
| 30.10.2009 | 31.10.2009 | 27.26 | 1.72 | HT Incomer Breaker Flesh Over | Fault attended & Unit Synchronised. | ||
| 2 | UNIT-2 | 04.10.2009 | 10.10.2009 | 135.16 | 8.45 | Turbine control valve problem | Fault attended & Unit Synchronised. |
| 10.10.2009 | 17.10.2009 | 156.51 | 9.80 | Turbine control valve problem | Fault attended & Unit Synchronised. | ||
| 3 | UNIT-3 | 11.10.2009 | 11.10.2009 | 2.27 | 0.15 | 415 Volt Supply fail | Fault attended & Unit Synchronised. |
| 4 | UNIT-4 | 15.10.2009 | 1710.2009 | 32.12 | 2.01 | Boiler T/L | Tube Leakage attended & Unit synch. |
| 5 | UNIT-5 | NO TRIPPING | |||||
| 6 | UNIT-6 | 21.10.2009 | 23.10.2009 | 47:25 | 9.48 | Condenser Tube Leakage | Tube Leakage attended & Unit synch. |
| 7 | UNIT-7 | 03.10.2009 | 03.10.2009 | 0:30 | 0.11 | PRDS control v/v fail | Fault attended & Unit Synchronised. |
| 05.10.2009 | 07.07.2009 | 51:50 | 10.89 | Reheater Tube Leakage | Tube Leakage attended & Unit synch. | ||
| 08.10.2009 | 08.10.2009 | 07:35 | 1.59 | Air Heater 7B Outage | Fault attended & Unit Synchronised. | ||
| 26.10.2009 | 26.10.2009 | 09:55 | 2.08 | Hotwell level control V/v MC fail | Fault attended & Unit Synchronised. | ||
| 7 | UNIT-8 | 06.10.2009 | 06.10.2009 | 01:40 | 0.35 | Furnace Draught High | Getting normal parameters, Unit synchronised. |
| 06.10.2009 | 06.10.2009 | 01:00 | 0.21 | Furnace Draught High | Getting normal parameters, Unit synchronised. | ||
| 11.10.2009 | 12.10.2009 | 27:35 | 5.79 | Condenser Vaccum problem | Getting normal parameters, Unit synchronised. | ||
| 13.10.2009 | 13.10.2009 | 02:50 | 0.60 | PA fan 8B Temp. high | Fault attended & Unit Synchronised. | ||
| 8 | UNIT-9 | 30.10.2009 | 01.11.2009 | 33:50 | 7.11 | LTSH T/L | Tube Leakage attended & Unit synch. |
| NOVEMBER | |||||||
| S.N. | DETAILS | DATE OF SHUTDOWN | DATE OF SYNCHRONISATION | PERIOD IN HR:MIN | MU LOST | REASON | CORRECTIVE ACTION TAKEN |
| PLANNED | |||||||
| NIL | |||||||
| FORCED | |||||||
| 1 | UNIT-1 | 27.11.2009 | 28.11.2009 | 20:49 | 1.30 | Water Wall Tube Leakage | Tube Leakage attended & Unit synch. |
| 2 | UNIT-2 | 05.11.2009 | 06.11.2009 | 35:37 | 2.23 | Water Wall Tube Leakage | Tube Leakage attended & Unit synch. |
| 14.11.2009 | 14.11.2009 | 06:17 | 0.39 | DMW Line leakage | Fault attended & Unit Synchronised. | ||
| 3 | UNIT-3 | 05.11.2009 | 06.11.2009 | 36:53 | 2.31 | Water Wall Tube Leakage | Tube Leakage attended & Unit synch. |
| 13.11.2009 | 14.11.2009 | 03:26 | 0.22 | BFP Outage | Fault attended & Unit Synchronised. | ||
| 14.11.2009 | 14.11.2009 | 01:30 | 0.07 | Low Vaccum | Getting normal parameters, Unit synchronised. | ||
| 4 | UNIT-4 | 23.11.2009 | 26.11.2009 | 78:53 | 4.93 | M.S. Temp. Low | Getting normal parameters, Unit synchronised. |
| 29.11.2009 | 30.11.2009 | 19:01 | 1.19 | Primary S/H Tube Leakage | Tube Leakage attended & Unit synch. | ||
| 5 | UNIT-5 | 12.11.2009 | 14.11.2009 | 43:39 | 2.73 | Condenser Tube Leakage | Tube Leakage attended & Unit synch. |
| 21.11.2009 | 21.11.2009 | 03:15 | 0.20 | Low Vaccum | Getting normal parameters, Unit synchronised. | ||
| 6 | UNIT-6 | NO TRIPPING | |||||
| 7 | UNIT-7 | 12.11.2009 | 12.11.2009 | 02:40 | 0.56 | PA Fan 7B Lube Line Leakage | Fault attended & Unit Synchronised. |
| 13.11.2009 | 16.11.2009 | 77:35 | 16.29 | LTSH Tube Leakage | Tube Leakage attended & Unit synch. | ||
| 8 | UNIT-8 | 21.11.2009 | 21.11.2009 | 02:35 | 0.54 | Turbine protection coil operated | Fault attended & Unit Synchronised. |
| 30.11.2009 | 30.11.2009 | 01:13 | 0.26 | FSSS operated | Getting normal parameters, Unit synchronised. | ||
| 9 | UNIT-9 | 01.11.2009 | 01.11.2009 | 08:20 | 1.75 | LTSH Tube Leakage | Tube Leakage attended & Unit synch. |
| 12.11.2009 | 14.11.2009 | 39:10 | 8.23 | Economiser Tube Leakage | Tube Leakage attended & Unit synch. | ||
| 15.11.2009 | 17.11.2009 | 49:10 | 10.29 | LTSH Tube Leakage | Tube Leakage attended & Unit synch. | ||
| DECEMBER | |||||||
| S.N. | DETAILS | DATE OF SHUTDOWN | DATE OF SYNCHRONISATION | PERIOD IN HR:MIN | MU LOST | REASON | CORRECTIVE ACTION TAKEN |
| PLANNED | |||||||
| NIL | |||||||
| FORCED | |||||||
| 1 | UNIT-1 | 22.12.2009 | 22.12.2009 | 00:34 | 0.04 | TST Low Vaccum | Getting normal parameters, Unit synchronised. |
| 2 | UNIT-2 | 17.12.2009 | 18.12.2009 | 20:12 | 1.26 | TST Spray valve leakage | Getting normal parameters, Unit synchronised. |
| 22.12.2009 | 22.12.2009 | 02:16 | 0.14 | TDT MS Temp drop | Getting normal parameters, Unit synchronised. | ||
| 3 | UNIT-3 | NO TRIPPING | |||||
| 4 | UNIT-4 | 07.12.2009 | 09.12.2009 | 41:17 | 2.58 | PSH Tube Leakage | Tube Leakage attended & Unit synch. |
| 5 | UNIT-5 | 05.12.2009 | 07.12.2009 | 47:24 | 2.96 | PSH Tube Leakage | Tube Leakage attended & Unit synch. |
| 07.12.2009 | 08.12.2009 | 33:19 | 2.08 | Water Wall Tube Leakage | Tube Leakage attended & Unit synch. | ||
| 6 | UNIT-6 | 18.12.2009 | 19.12.2009 | 23:05 | 4.62 | Non availability of coal,CHP problem | Unit Synchronised after resuming Coal Supply |
| 23.12.2009 | 23.12.2009 | 01:35 | 0.32 | To attend R phase dropper of Generator bay No. 21 | Fault attended & Unit Synchronised. | ||
| 29.12.2009 | 30.12.2009 | 31:00 | 6.20 | Economiser Tube Lealage | Tube Leakage attended & Unit synch. | ||
| 7 | UNIT-7 | NO TRIPPING | |||||
| 8 | UNIT-8 | 13.12.2009 | 15.12.2009 | 50:22 | 10.58 | PA Fan 8B Outage | Problem attended & Unit Synch. |
| 17.12.2009 | 18.12.2009 | 37:15 | 7.82 | Furnace protection | Getting normal parameters, Unit synchronised. | ||
| 21.12.2009 | 21.12.2009 | 01:33 | 0.33 | Furnace protection | Getting normal parameters, Unit synchronised. | ||
| 21.12.2009 | 21.12.2009 | 01:15 | 0.26 | Furnace protection | Getting normal parameters, Unit synchronised. | ||
| 23.12.2009 | 25.12.2009 | 33:55 | 7.12 | Water Wall Tube Leakage | Tube Leakage attended & Unit synch. | ||
| 27.12.2009 | 28.12.2009 | 11:45 | 2.47 | PA Fan 8B Outage | Problem attended & Unit Synch. | ||
| 9 | UNIT-9 | NO TRIPPING | |||||