INSTALLED
CAPACITY ( | |||
|
SL.No.
|
Power
Station
|
Installed
Capacity (MW)
|
M
P SHARE |
|
(MW)
| |||
|
1 |
Amarkantak
II (2x120 MW)
|
240 |
240 |
|
|
Amarkantak
Extn (210 MW)
|
210 |
210 |
|
3 |
Satpura
I (5x62.5 MW)
|
312.5 |
187.5 |
|
4 |
Satpura
II (200+210 MW)
|
410 |
410 |
|
5 |
Satpura
III (2x210 MW)
|
420 |
420 |
|
6 |
Sanjay
Gandhi, Birsinghpur -I (2x210
MW)
|
420 |
420 |
|
7 |
Sanjay
Gandhi Birsinghpur -II (2x210
MW)
|
420 |
420 |
|
8 |
Sanjay
Gandhi Birsinghpur -Extn (1x500 MW) |
500 |
500 |
|
|
Thermal
Power Station |
2932.5 |
2807.5 |
|
1 |
Gandhi
Sagar(5x23 MW)
|
115 |
57.5 |
|
2 |
Pench,Totladoh(2x80
MW)
|
160 |
107 |
|
3 |
Rani
Awanti Bai Bargi (2x45 MW)
|
90 |
90 |
|
4 |
Ban
Sagar I Tons(3x105 MW)
|
315 |
315 |
|
5 |
Birsinghpur(1x20
MW)
|
20 |
20 |
|
6 |
Rajghat
(3x15 MW)
|
45 |
22.5 |
|
7 |
Ban
Sagar II Silpara(2x15
MW)
|
30 |
30 |
|
8 |
Bansagar
-III Deolond (3x20 mW)
|
60 |
60 |
|
9 |
Bansagar
-IV Jhinna (2x10
MW) |
20 |
20 |
|
10 |
Madhikheda
(3x20 MW) |
60 |
60 |
|
Jawaharsagar
& Ranapratapsagar Station of Rajasthan (99MW
& 172 MW), 50% of 271MW
|
----
|
135.5 | |
|
|
Hydro
Power Station
|
915 |
917.5 |
|
|
Total
|
3847.5 |
3725 |